Construction expert document review establishes what the work was supposed to be and what happened on the project. Paul Gaston reviews contracts, drawings, specifications, change orders, RFIs, submittals, daily reports, inspection records, invoices and photographs in date order, and identifies gaps in the record that counsel may want to pursue in discovery.

Records Paul Typically Requests

RecordWhat it shows
Contract, proposal and scope documentsWhat was agreed and at what price
Drawings and specifications, with addendaWhat was designed and specified
Change orders and RFIsHow the requirements changed and why
Submittals and product dataWhat products and details were approved
Schedules and daily reportsSequence, staffing and problems as they happened
Inspection reports and punch listsWhat was checked, found and corrected
Photographs and videoConditions during and after construction
Invoices, pay applications and correspondenceProgress, disputes and acknowledgments

Not every project has every record. Missing records are noted, because the absence of a record can be significant.

Reading the Records in Order

Construction requirements change over the life of a project. A detail on the original drawings may have been revised by an RFI response, replaced by an approved submittal and modified again by a change order. Paul reviews records in date order to establish what the requirement was when each item was installed. That chronology often resolves disputes about whether a condition was a defect or an approved change.

Photographs and Field Records

Photographs taken during construction are often the best evidence of concealed work: framing before drywall, substrates before flooring, blocking before cabinets. Paul reviews them alongside daily reports and inspection records to understand what was covered and when. He relies on photographs for what they show and notes where the date, location or source of a photograph cannot be confirmed.

Helping Counsel With Discovery

Early document review often identifies records that should exist but have not been produced, such as daily reports for a key period, inspection records for a particular area, or manufacturer instructions for a product. Paul can provide counsel with a list of those gaps and suggested topics for contractor depositions. His observations are provided to counsel; legal strategy remains counsel's decision. See expert witness services for the scope of consulting engagements.

Keeping the Record Organized

Large productions can run to thousands of pages and photographs. Paul indexes the materials he relies on so that each opinion can be traced back to specific documents. That index becomes part of the list of materials reviewed in his report and makes it easier for counsel to respond quickly to questions at deposition about what Paul did and did not consider.

Questions

Common Questions

What documents should I send first?

The contract and scope documents, the drawings and specifications, change orders, and any photographs. Paul will identify other records needed after his initial review.

Why does the order of documents matter?

Requirements change through RFIs, submittals and change orders. Reviewing in date order shows what the requirement was when the work was installed.

Can Paul help identify missing records?

Yes. He can list records that would normally exist on a project of that type and that do not appear in the production.

When should documents be sent?

After the conflict check is cleared and the engagement is in place. Paul does not accept case documents before then.

Have a workmanship dispute that needs a builder's eye?

Send the party names for a conflict check and a short description. Paul will tell you plainly whether the matter fits his experience.